Job Lab field guide

Practical job-planning guides

Choose the decision you need to make, read the limits of the method, then use the linked calculator with your own job data. These guides route the work; they do not rank products or turn a calculation into permission to proceed.

Choose the decision you need to make

Start with the uncertainty that can change the job. If it is electrical demand, separate running load, startup and lead voltage drop. If it is exposure, use representative magnitude, level and time. If it is task fit, identify the material, operation and all independent stop conditions before looking at a size.

Each guide shows what to record, what the arithmetic can say and what must be confirmed elsewhere. Calculators support that record; they do not replace equipment instructions, assessment or competent advice. You can combine selected records in a printable Job Pack, or browse all calculators.

If several questions apply, begin with a stop condition: unknown material, unresolved services, enclosed fuel-generator location or missing equipment markings. Resolve that before spending time refining quantities.

Power and supply

  • Power / 01

    110 V site power

    Convert concurrent electrical input to apparent load, distinguish continuous from intermittent transformer ratings, and check actual extension-lead data.

    Use this method
  • Power / 02

    Generators on site

    Apply the carbon-monoxide location stop first, then organise running loads, one declared start event, rating basis and manufacturer confirmation.

    Use this method
  • Power / 03

    Battery runtime and packs

    Separate nominal and usable watt-hours, trigger time and elapsed time without making a compatibility or runtime promise.

    Use this method

Exposure and dust

  • Exposure / 01

    Vibration and noise

    Build separate daily HAVS and noise records from representative inputs, understand action/limit values and avoid arithmetic averaging of decibels.

    Use this method
  • Control / 02

    Dust control at source

    Match extraction or water suppression to material and task, confirm capture performance, and recognise specialist-hazard stops.

    Use this method

Exposure and control outputs are planning records. A result below a threshold is not reassurance that the assessment and control duties are complete.

Task and cost planning

  • Fit / 01

    Angle-grinder discs

    Distinguish cutting, grinding and polishing, then check markings, diameter, RPM, interface, guard and stated depth independently.

    Use this method
  • Fit / 02

    Core drilling

    Define the hole and stop for unresolved structure, reinforcement, services, anchorage, breakthrough, water or dust before routing equipment.

    Use this method
  • Cost / 03

    Hire or buy

    Compare your own like-for-like prices against programme, utilisation, maintenance, storage, downtime and actual terms.

    Use this method

How the guides are checked

Consequential claims carry adjacent markers for legislation, HSE guidance, manufacturer/technical input, conservative Job Lab policy or transparent arithmetic. The source register records canonical links and truthful date labels; Methodology explains formula versions, rounding, fail-closed behaviour and change control.

Where a guide uses a model-specific rating or manufacturer range, keep that example tied to its cited source. Do not transfer it to another product or treat a range boundary as a universal selection rule.