Independent planning instruments · UK

Plan the job before you pick the tool.

Twelve deterministic planning calculators for UK site power, exposure, dust and consumables — every result stamped with its basis, assumptions and sources.

Live instrument — HAVS daily exposureSTATUTORY EXPOSURE CALCULATION

5 m/s² example value

Trigger time — not shift length
100 points

at the exposure action value (EAV)

0EAV 100ELV 400
Assumptions register

5 m/s² × 2 h trigger time

Trigger time is used; shift length is not used.

Planning aid. Does not replace competent-person assessment, manufacturer instructions or HSE guidance.

Open the full HAVS calculator

ST-01

Build one neutral job record

Worked builder example

Task: core drilling into declared unreinforced masonry. Entered diameter: 82 mm. Site supply: 110 V. Trigger-time data has not been supplied.

Assumptions register
  • Material declared as masonry
  • No concealed services declared
  • No exposure magnitude or trigger time supplied
Open the Job Pack Builder
Example recordPLANNING RECORD
  • Task & fit: requires explicit tool/accessory table
  • Power: 110 V supply declared; load not assessed
  • Exposure: not assessed
  • Dust: not assessed
  • Consumables: not assessed

Missing data remains not assessed; it is never silently inferred.

ST-02

Instrument index

Power & supply

Exposure & health

Task & fit

Quantities & time

ST-03

Method that stays visible

01 · sourced

Formulae and rules are sourced and dated.

02 · fail closed

Required data fails closed rather than being silently assumed.

03 · versioned

Test vectors and registry versions are published.